If installed in an appropriate environment, the VFD requires very little maintenance. The table lists the routine maintenance intervals recommended by INVT.

Checking

Item

Method

Criterion

Ambient   

environment

Check the ambient temperature, humidity and vibration   and ensure there is no dust, gas, oil fog and water drop.

Visual examination

and instrument test

Conforming to the manual

Ensure there are no tools or other foreign or   dangerous objects

Visual examination

There are no tools or dangerous objects.

Voltage

Ensure the main circuit and control circuit are   normal.

Measurement by millimeter

Conforming to the manual

Keypad

Ensure the display is clear enough

Visual examination

The characters are displayed normally.

Ensure the characters are displayed totally

Visual examination

Conforming to the manual

Main

circuit

For public use

Ensure the screws are tightened firmly

Tighten up

NA

Ensure there is no distortion, crackles, damage or   color-changing caused by overheating and aging to the machine and insulator.

Visual examination

NA

Ensure there is no dust and dirtiness

Visual examination

NA

Note: if the color of the copper blocks change, it does   not mean that there is something wrong with the features.

The lead

of the 

conductors

Ensure that there is no distortion or   color-changing of the conductors caused by overheating.

Visual examination

NA

Ensure that there are no crackles or   color-changing of the protective layers.

Visual examination

NA

Terminals

seat

Ensure that there is no damage

Visual examination

NA

Filter capacitors

Ensure that there is no weeping, color-changing,   crackles and cassis expansion.

Visual examination

NA

Ensure the safety valve is in the right place.

Estimate the usage time according to the   maintenance or measure the static capacity.

NA

If necessary, measure the static capacity.

Measure the capacity by instruments.

The static capacity is above or equal to the   original value *0.85.

Resistors

Ensure whether there is replacement and splitting   caused by overheating.

Smelling and visual examination

NA

Ensure that there is no offline.

Visual examination or remove one ending to   coagulate or measure with multimeters

The resistors are in ±10% of the standard value.

Transformers 

and   reactors

Ensure there is no abnormal vibration, noise and   smelling,

Hearing, smelling and visual examination

NA

Electromag

netism   contactors

and relays

Ensure whether there is vibration noise in the workroom.

Hearing

NA

Ensure the contactor is good enough.

Visual examination

NA

Control circuit

PCB and

plugs

Ensure there are no loose screws and contactors.

Fasten up

NA

Ensure there is no smelling and color-changing.

Smelling and visual examination

NA

Ensure there are no crackles, damage distortion   and rust.

Visual examination

NA

Ensure there is no weeping and distortion to the   capacitors.

Visual examination or estimate the usage time   according to the maintenance information

NA

Cooling system

Cooling fan

Estimate whether there is abnormal noise and   vibration.

Hearing and Visual examination or rotate with hand

Stable rotation

Estimate there is no losses screw.

Tighten up

NA

Ensure there is no color-changing caused by   overheating.

Visual examination or estimate the usage time   according to the maintenance information

NA

Ventilating

duct

Ensure whether there is stuff or foreign objection   in the cooling fan, air vent.

Visual examination

NA

For more information about the maintenance, contact the local INVT office, or visit the website http://www.invt.com.cn of Shenzhen INVT Electric CO., Ltd., choosing Service and Support on the homepage to obtain the online service you need.